Example project
Step 6 of 786% complete

Cost & materials

Total (gross)
PLN 1,255,000
Cost per m²
PLN 10,458
Monthly payment
PLN 6,972
30 years · 6.75% fixed
MaterialQtyAmount
Timber frame wall elements150 m²PLN 91,500
Mineral wool insulation λ 0.035504 m²PLN 24,192
Triple-glazed windows Uw 0.822 m²PLN 36,300
Larch façade cladding132 m²PLN 29,040
Standing-seam steel roof162 m²PLN 42,120
Insulated raft foundation (XPS 300)120 m²PLN 78,000
Air-to-water heat pump 8 kW1 pcsPLN 34,000
MVHR ventilation unit1 pcsPLN 16,000
PV system 6 kWp1 setPLN 26,000
External venetian blinds9 pcsPLN 13,950

Site & trade work — indicative

indicative

Friendly guideline prices from the Polish market, before VAT — a good starting point for your budget, not a quote. Once your architect has settled the design, ask 2–3 local contractors for a real offer.

Site preparation & groundworkExcavation, levelling, drainage and accessPLN 34,400
  • Excavation & levellingPLN 14,400
  • Drainage (perimeter and stormwater)PLN 11,000
  • Site access & driveway basePLN 9,000
Concrete works (beyond the slab)The foundation slab is already in its own line; this covers retaining walls, steps and terrace basePLN 24,000
  • Retaining wallsPLN 14,000
  • Entrance steps & terrace basePLN 10,000
Plumbing incl. materialsWater, drainage, underfloor heating and heat pump connectionPLN 43,200
  • Water supply & sewer (inside and to the boundary)PLN 22,000
  • Underfloor heating loops & manifoldsPLN 13,200
  • Heat pump hydraulic connectionPLN 8,000
Electrical works incl. materialsWiring, lighting, heat pump, ventilation and solar connectionsPLN 41,800
  • Wiring, switchgear & socketsPLN 22,800
  • Lighting fittingsPLN 6,000
  • Heat pump & ventilation power and controlsPLN 5,500
  • PV inverter, cabling & grid connectionPLN 7,500
Ventilation (installation)MVHR unit, ducts and fittingPLN 31,600
  • MVHR unitPLN 16,000
  • Ducts & fittingsPLN 9,600
  • Installation & commissioningPLN 6,000

Amounts shown before VAT — VAT is added in your total.

Financing

PLN 180,000
Mortgage
PLN 1,075,000
Loan-to-cost
86%
Bank min. own capital
✓ ≥ 10% met

Possible public support

Indicative

Poland offers support schemes that can help when you build a home. Here is what is worth knowing about — as possibilities to explore, not money to count on in advance.

Please check before you rely on this. Support schemes change from year to year: rules, amounts and income limits are updated, and calls can open, close or run out of funds. The figures here are indicative. Always check the current terms on the official pages before counting on any of them.
  • Moje Ciepło — Heat pump in a new houseOfficial page: mojecieplo.gov.pl ↗

    Up to PLN 7,000 (air-source) · up to PLN 21,000 (ground-source) · indicative

    Energy-efficiency and other conditions apply to new buildings; one grant per building.

  • Mój Prąd — Home energy storage (and solar, depending on the call)Official page: mojprad.gov.pl ↗

    Amount set by each call — earlier calls paid roughly PLN 5,000–16,000 for energy storage · indicative

    Calls open and close; the current call may differ or be closed.

  • Rodzinny Kredyt Mieszkaniowy — Guarantee instead of own contributionOfficial page: bgk.pl ↗

    Guarantee of up to PLN 100,000 · indicative

    Household conditions and BGK price limits apply, and not every bank offers it — check whether building your own house qualifies.

  • Konto Mieszkaniowe — Savings for housing with a state premiumOfficial page: gov.pl ↗

    Yearly state premium on your savings (rate set by law) · indicative

    Monthly deposits are capped and the account runs for a limited period, through participating banks.

  • Mikroretencja — Rainwater harvesting in the gardenOfficial page: gov.pl ↗

    Up to PLN 8,000 (max. 90% of eligible costs) · indicative

    Applied for through your regional environmental fund (WFOŚiGW); funds are limited and awarded in order of application.

These amounts are not deducted from your estimate. The total above includes no support — they are shown as possible support only.