Cost & materials
| Material | Qty | Amount |
|---|---|---|
| Timber frame wall elements | 150 m² | PLN 91,500 |
| Mineral wool insulation λ 0.035 | 504 m² | PLN 24,192 |
| Triple-glazed windows Uw 0.8 | 22 m² | PLN 36,300 |
| Larch façade cladding | 132 m² | PLN 29,040 |
| Standing-seam steel roof | 162 m² | PLN 42,120 |
| Insulated raft foundation (XPS 300) | 120 m² | PLN 78,000 |
| Air-to-water heat pump 8 kW | 1 pcs | PLN 34,000 |
| MVHR ventilation unit | 1 pcs | PLN 16,000 |
| PV system 6 kWp | 1 set | PLN 26,000 |
| External venetian blinds | 9 pcs | PLN 13,950 |
Site & trade work — indicative
indicativeFriendly guideline prices from the Polish market, before VAT — a good starting point for your budget, not a quote. Once your architect has settled the design, ask 2–3 local contractors for a real offer.
Site preparation & groundworkExcavation, levelling, drainage and accessPLN 34,400
- Excavation & levellingPLN 14,400
- Drainage (perimeter and stormwater)PLN 11,000
- Site access & driveway basePLN 9,000
Concrete works (beyond the slab)The foundation slab is already in its own line; this covers retaining walls, steps and terrace basePLN 24,000
- Retaining wallsPLN 14,000
- Entrance steps & terrace basePLN 10,000
Plumbing incl. materialsWater, drainage, underfloor heating and heat pump connectionPLN 43,200
- Water supply & sewer (inside and to the boundary)PLN 22,000
- Underfloor heating loops & manifoldsPLN 13,200
- Heat pump hydraulic connectionPLN 8,000
Electrical works incl. materialsWiring, lighting, heat pump, ventilation and solar connectionsPLN 41,800
- Wiring, switchgear & socketsPLN 22,800
- Lighting fittingsPLN 6,000
- Heat pump & ventilation power and controlsPLN 5,500
- PV inverter, cabling & grid connectionPLN 7,500
Ventilation (installation)MVHR unit, ducts and fittingPLN 31,600
- MVHR unitPLN 16,000
- Ducts & fittingsPLN 9,600
- Installation & commissioningPLN 6,000
Amounts shown before VAT — VAT is added in your total.
Financing
Possible public support
IndicativePoland offers support schemes that can help when you build a home. Here is what is worth knowing about — as possibilities to explore, not money to count on in advance.
- Moje Ciepło — Heat pump in a new houseOfficial page: mojecieplo.gov.pl ↗
Up to PLN 7,000 (air-source) · up to PLN 21,000 (ground-source) · indicative
Energy-efficiency and other conditions apply to new buildings; one grant per building.
- Mój Prąd — Home energy storage (and solar, depending on the call)Official page: mojprad.gov.pl ↗
Amount set by each call — earlier calls paid roughly PLN 5,000–16,000 for energy storage · indicative
Calls open and close; the current call may differ or be closed.
- Rodzinny Kredyt Mieszkaniowy — Guarantee instead of own contributionOfficial page: bgk.pl ↗
Guarantee of up to PLN 100,000 · indicative
Household conditions and BGK price limits apply, and not every bank offers it — check whether building your own house qualifies.
- Konto Mieszkaniowe — Savings for housing with a state premiumOfficial page: gov.pl ↗
Yearly state premium on your savings (rate set by law) · indicative
Monthly deposits are capped and the account runs for a limited period, through participating banks.
- Mikroretencja — Rainwater harvesting in the gardenOfficial page: gov.pl ↗
Up to PLN 8,000 (max. 90% of eligible costs) · indicative
Applied for through your regional environmental fund (WFOŚiGW); funds are limited and awarded in order of application.
These amounts are not deducted from your estimate. The total above includes no support — they are shown as possible support only.